We present to your attention real estate under construction in Alanya from a reliable and trusted developer. This project is an excellent investment in luxury real estate. The luxury project will be located in Alanya in the prestigious Oba district, just 3 km from the city center. The complex will consist of six 4-storey residential blocks, 180 apartments with different layouts and footage from 50 m² to 205 m². There is a wide selection of one-bedroom apartments, comfortable and spacious two-bedroom apartments, luxurious two-story duplexes with two and three bedrooms. Ground floor duplexes with access to the garden, apartments with three bedrooms and separate kitchens. All apartments are rented with high-quality finishing, plumbing, and kitchen units. The complex will be located on an area of 11,000 m², from the panoramic windows of the apartments there will be a beautiful view of the whole of Alanya and the sea. The area will be decorated with decorative green spaces and a well-kept garden. COMPLEX INFRASTRUCTURE: • Outdoor adult and children's pools • Children's playground • Gazebos for relaxation and barbecue area • Tennis court • Mini golf • Heated indoor pool • Sauna and jacuzzi • Massage rooms • Turkish bath (hamam) • Showers and changing rooms • Fitness room • Cinema • Internet in the common area of the project • Open and closed parking • Generator • Fenced and guarded area • 24-hour video surveillance • Apartment for receptionist • Gardener and Caretaker TECHNICAL CHARACTERISTICS OF THE APARTMENTS: • According to the project, the internal walls of the apartments are finished with gypsum plaster, decorated suspended ceilings • Ceramic and marble flooring • Double walls with sound-heat insulation • Interior doors • Armored entrance doors • Double glazed windows, PVC • Internet and central satellite system • Special finishing of external walls • Built-in kitchen • Granite countertops • Ceramic flooring • Ceramic finishing of walls and floors • Built-in furniture in bathrooms, washbasin, wall-hung toilet, shower cabin • Boiler • Aluminum railings + glass • Ceramic floors and external lighting Start of construction 03/30/2021 Completion scheduled for 09/30/2023